TexasDataCenter.org collects the public paper trail behind data centers in Texas and files it by place, so someone who lives near one can find out what was approved, by whom and on what terms.
Where we stand
We are not against data centers. They run things people use every day, and artificial intelligence is a useful technology that is going to matter more, not less. It also matters who builds it. The United States is in a race with China, and we want this country to win it. That takes computing power, and computing power takes data centers.
Our objection is to how fast they are being built and where.
- Too fast. A project can go from a code name in a closed session to an approved tax abatement in under a year, with a public hearing that draws no comments because almost nobody knew what it was for. A decision that reshapes a town for forty years deserves more time than that, and the people who live there deserve to read the terms before the vote, not after.
- In the wrong places. Too many are going in beside neighborhoods, over stressed aquifers, and in small towns whose water and power systems were built for a few thousand homes. There is a great deal of land in Texas. A data center does not have to sit behind somebody's back fence.
Two things worry us most.
Kids need clean air
Data centers draw enormous amounts of electricity, and much of it still comes from burning fuel. Researchers at MIT modeled the extra air pollution caused by data centers' electricity demand and estimated it led to about 650 premature deaths in the United States in 2023. The harm did not stay where the buildings are: most of the demand was in northern Virginia and Texas, while states such as Iowa, Kansas and South Dakota saw some of the highest death rates. MIT News, Nov. 19, 2026.
That figure covers power from the grid only. It leaves out the gas turbines and diesel backup generators that sit on the sites themselves, next to the neighbors. A separate estimate by university researchers puts the public health cost of U.S. data centers at more than $20 billion a year by 2028. Han et al., arXiv. Children breathe faster than adults and their lungs are still growing, which is why we care who ends up downwind.
Water is not unlimited here
Much of Texas is short of water in a normal year. A facility that needs water for cooling, or that ties up water rights a town will need later, should have to show its numbers in public and have them written into the agreement, with a cap and annual reporting. Where that has not happened, neighbors have been left to find out the hard way.
What it looks like when it goes wrong
These are not Texas stories. They are what we would like Texas towns to avoid. Each is reported by a news outlet and linked; where the company disputes the account, we say so.
- Wells full of silt next to a Meta data center
Four families who live beside Meta's data center campus sued the company in 2026. They say the clearing, blasting and excavation disturbed the aquifer under their homes and filled their well water with silt and sediment that clogged their water lines and ruined their appliances. Meta says a study it commissioned found groundwater flows away from their properties, and that it will defend itself.
- "I can't breathe at home"
xAI powered its supercomputer with 35 methane gas turbines, none with pollution controls and, at the time, none with a Clean Air Act permit. The neighborhood next door already led the state in emergency room visits for asthma. At a public hearing, Boxtown resident Alexis Humphreys held up her inhaler and said: "I can't breathe at home, it smells like gas outside."
- "I literally just leave my house"
Homeowners beside a data center campus say its generators fire up at random hours of the day and night, sometimes for more than two hours. One told a reporter she simply leaves her house when it starts. The county health department opened a noise investigation after formal complaints.
What we want
- Agreements, abatement terms and water commitments published before the vote.
- Sites chosen away from homes, schools and scarce water.
- Pollution controls and permits in place before the turbines and generators run.
- Tax breaks sized to what the town gets back, with clawbacks if promises are missed.
- Enough time for residents to read, ask and be answered.
Our views and our records are kept apart
This page is opinion. The facility pages are not. A record says what a document says, names the document and links it, and reports contested numbers as each side stated them. If you think data centers are the best thing to happen to your county, the records here should still be useful to you, and if one is wrong we want to know.
What is on a facility page
- Who is behind it: the operator and the legal entities that signed the paperwork.
- Where it is, how large the site is and how much power it is planned to draw.
- Tax incentives: who granted them, the percentage and the term.
- A dated timeline of public actions: hearings, votes, permits.
- The documents themselves, with a link to where each one was found.
Where records come from
- City council, planning and zoning, and county commissioners court agendas, minutes and recordings.
- Ordinances, resolutions, development agreements and tax abatement agreements.
- State filings: environmental permits, utility and grid filings, incentive registries.
- Appraisal district and deed records.
- Local news reporting, linked and labelled as news, for context and for leads.
How to read a record
- A page marked Draft record has not been checked line by line against its sources yet. Use it as a lead.
- A document marked Not yet archived is known to exist, usually because an agenda or minutes refer to it, but we do not hold a copy.
- Numbers such as investment and water use are reported as the source stated them, with the source named. Developers, officials and reporters often give different figures for the same project; where they do, the page shows each.
- A county with no records has not been researched yet. It does not mean no data center is there.
Who runs it
One Texas resident, working independently. The project takes no money from data center operators, utilities or governments, and is not a nonprofit. It is paid for by reader support.
Corrections
If a record is wrong, say so and point to the document that shows it. Corrections are made on the page with the date the record changed.