Medina County / Lytle /

Project Pirate

Proposed · decisions still openRowan Digital Infrastructure · Record updated 2026-11-26

Draft record. This page has not yet been checked line by line against the source documents. Treat it as a lead, not a citation.

A second Rowan data center site of about 284 acres next to Lytle. Annexation, industrial rezoning and a second reinvestment zone went to public hearing in October 2026, and the planning and zoning commission recommended denying the rezoning. The council has discussed it only in executive session since; no abatement terms have been stated on the record.

Where this stands and what you can do

The council has held public hearings but has not voted on annexation, zoning or a reinvestment zone. The land is outside city limits, in the area where a Texas city generally cannot control how property is used, so a vote against annexation would not by itself stop the project: it could be built under county rules, which include no zoning. What the city does control is the terms it attaches to annexation, zoning, city utilities and any tax abatement. That is where residents have the most say, and the window is open now.

  1. Ask the council to write real standards before it votes. The city can put conditions in its zoning ordinance and in the development agreement: a cap on water use with yearly reporting, a noise limit at the property line, set hours for generator testing, setbacks and buffers from the Coal Mine neighborhood, and lighting and truck-route rules. Ask that the draft agreement be posted before the vote.

    Contact: Lytle City Council · contact form

    A letter you can copy: ask for conditions before a vote

    Send to: Mayor and council members. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Project Pirate - conditions before any vote
    
    Dear Mayor and Council Members,
    
    I live in [neighborhood / street] and I am writing about Project Pirate (Rowan Digital Infrastructure).
    
    I am not asking you to turn away investment. I am asking that no annexation, zoning change, utility agreement or tax abatement for this project be approved until the following are written into the ordinance or the agreement itself:
    
    1. Water: a cap on annual water use, stated in acre-feet, with a yearly public report of actual use.
    2. Noise: a limit measured at the property line, and set hours for testing backup generators.
    3. Distance: a minimum setback and a buffer between the buildings, the generators and the nearest homes.
    4. Power: disclosure of any on-site power plant or generators, and the air permits they will need.
    5. Money: any tax abatement tied to a minimum investment, a jobs and wage floor, and a clawback if those are missed.
    6. Transparency: the draft agreement posted publicly at least [14] days before the vote.
    
    Please tell me which of these the current draft includes, and when the public will be able to read it.
    
    Thank you,
    [Name]
    [Address]
    [Phone or email]
  2. Ask the council to make any tax abatement earn its keep. No abatement terms have been stated on the record. An abatement is the city's choice. Ask that any offer state its percentage, years and dollar value, and be tied to investment, jobs, wages and a clawback. The meeting to approve one must be posted 30 days ahead.

    Contact: Lytle City Council · contact form

    A letter you can copy: comment on a tax abatement

    Send to: The body considering the abatement (city council or commissioners court). Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Tax abatement for Project Pirate
    
    Dear [Mayor and Council Members / Judge and Commissioners],
    
    I am writing about the tax abatement requested for Project Pirate (Rowan Digital Infrastructure).
    
    A tax abatement is your decision to make; state law does not require one. Before you vote, I ask that you:
    
    1. State publicly the percentage, the number of years, and the dollar value of the taxes that would be forgiven.
    2. Compare the request with what other Texas cities and counties have granted for similar projects.
    3. Require a minimum investment, a minimum number of full-time jobs at a stated wage, and repayment if those terms are not met.
    4. Require an annual compliance report, posted publicly.
    5. Explain what Lytle and Medina County receive in return, and when.
    
    If these terms cannot be met, I ask that you vote no.
    
    Thank you,
    [Name]
    [Address]
  3. If you own land next to the site, consider a written protest. If the land is annexed and rezoned, a signed protest by the owners of at least 20 percent of the land within 200 feet of the rezoning means it needs a three-fourths vote of the whole council. The planning and zoning commission has already recommended denial.

    Contact: Read the law · Lytle City Council · contact form

  4. Ask the city to adopt data center standards for every future project. Lytle added data centers to its Industrial district in 2024 by adding a definition and listing them as an allowed use. Standards written into the ordinance now would apply to this project if it is annexed and to the next one.

    Contact: Lytle City Council · contact form

    A letter you can copy: ask the city to adopt data center standards

    Send to: Mayor and council members, with a copy to the planning and zoning commission. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Zoning standards for data centers in Lytle
    
    Dear Mayor and Council Members,
    
    Data centers are being built across this part of Texas, and Lytle is likely to see more requests. I am asking the council to adopt clear standards in the zoning ordinance now, before the next application, so that every project is held to the same rules and neighbors know what to expect.
    
    I ask that the ordinance address at least:
    
    1. Where: which zoning districts allow a data center, and whether each one needs council approval.
    2. Distance: minimum setbacks and landscaped buffers from homes, schools and parks.
    3. Noise: a limit measured at the property line, day and night, and set hours for testing backup generators.
    4. Power: rules for on-site generators and gas turbines, and proof of the required state air permits before they run.
    5. Water: disclosure of the cooling method and expected annual water use, with yearly reporting.
    6. Lighting, building height and truck routes.
    7. Notice: mailed notice to nearby owners and a posted draft of any development agreement before a vote.
    
    Other Texas cities have adopted rules like these. I would be glad to see this placed on a planning and zoning agenda, and I would like to know when it could be.
    
    Thank you,
    [Name]
    [Address]
  5. Write to the Medina County Commissioners Court. If the project stays outside the city, the county is the local government. It decides on any county tax abatement and controls county roads. It granted an 80 percent abatement to the company's first site.

    Contact: Medina County Commissioners Court · how to speak or comment

    A letter you can copy: write to the commissioners court

    Send to: County judge and commissioners. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Data center development in Medina County - Project Pirate
    
    Dear Judge and Commissioners,
    
    I live in Medina County near Project Pirate (Rowan Digital Infrastructure).
    
    I understand the county's power over land use outside city limits is limited. I am asking you to use the authority you do have:
    
    1. Grant no tax abatement or other incentive without a public hearing, published terms, and a clawback.
    2. Use the court's control over county roads to make sure the builder, not county taxpayers, pays for damage from construction traffic.
    3. Apply the county's subdivision, drainage and fire code rules in full, and say publicly which apply to this site.
    4. Post every agreement with a data center developer on the county website.
    5. Ask our state legislators for the authority counties need to set reasonable standards for projects of this size.
    
    Please let me know when the court will next take up an item involving this project.
    
    Thank you,
    [Name]
    [Address]
  6. Watch for state air permits. Backup generators and any on-site power plant need air authorizations from the state. Some kinds take public comment. None has been found for this site yet.

    Contact: TCEQ: comment on a pending permit · TCEQ: environmental complaint

  7. Ask the Legislature for rules that apply outside city limits. Whether a county can set standards for a project like this is decided in Austin.

    Contact: Who Represents Me (Texas Legislature) · Office of the Texas Governor

    A letter you can copy: write to your state senator and representative

    Send to: Your Texas state senator and state representative. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Data center siting and reporting standards - Medina County
    
    Dear [Senator / Representative] [Name],
    
    I am your constituent in Medina County, where Project Pirate (Rowan Digital Infrastructure) is [proposed / being built / operating] near homes.
    
    I support data centers being built in Texas. My concern is where and how fast. Outside city limits, counties have almost no say, and neighbors learn the terms after the vote. I ask that you support legislation that would:
    
    1. Give counties authority to set reasonable siting standards for large data centers: setbacks from homes and schools, noise limits, and limits on on-site power generation near neighborhoods.
    2. Require data centers above a set size to report their water and electricity use each year, publicly.
    3. Require that tax abatement and development agreements with data centers be posted before the vote, not after.
    4. Require air permits and pollution controls to be in place before on-site turbines and generators run.
    
    Please tell me your position on these, and whether a bill addressing them is filed or planned.
    
    Thank you,
    [Name]
    [Address - so your office can confirm I am a constituent]
  8. Request the documents. The annexation petition, the reinvestment zone application and the draft development agreement are public records that have not been published.

    Contact: How to file a public information request

This is general information about how local and state decisions get made, not legal advice.Who decides what, and every contact and letter in one place.

Legal entities
Rowan Lytle LLC
Also known as
Reinvestment Zone No. 2; Dell's Grass property
Location
West of Hwy 132 and north of County Road 683 (city annexation notice), next to Project Cinco
Jurisdiction
City of Lytle extraterritorial jurisdiction. Annexation, rezoning and a reinvestment zone went to public hearing on 2026-10-19; the council had not voted on any of them as of its 2026-11-09 meeting.
Site
284 acres
Investment
Minimum $900 million, according to the developer's factsheet.
Water
The city administrator, relaying Rowan's figures, said each building's cooling system would be filled once with about 1.5 million gallons and is designed to last 10 to 15 years (public hearing, 2026-10-19).

Documents and sources

73 items: Government records (15) · Meetings (40) · Appraisal district records (5) · News and company statements (13)

Government records

Ordinances, resolutions, agreements, notices, permits and filings.

DateDocumentFromLink
2026-11-17TCEQ RN112564471, Project Pirate: construction stormwater permit TXR1508ZY
Active, held by Turner Construction Company. TCEQ gives the location as the northeast corner of SH 132 and CR 683, which is consistent with the city notices; the permit does not name Rowan, so the match rests on the project name and location. If the link errors, search the RN at www15.tceq.texas.gov/crpub.
Texas Commission on Environmental QualityOpen
2026-09-30Notice of voluntary annexation, 288.10 acres
As published in the newspaper.
City of LytleOpen
2026-09-30Notice of rezoning to Industrial, 284.04 acres
As published in the newspaper.
City of LytleOpen
2026-09-30Notice of application for Reinvestment Zone No. 2, 284.25 acres
As published in the newspaper. Lists the Medina CAD parcels.
City of LytleOpen
2026-09-30Public hearing notice, 14916 Main Street, Lytle (reprint)NoticeRegistryOpen
2026-08-24Resolution 26-40, Kimley-Horn site development plan review
Approved 5-0.
City of LytleNot yet archived. Have it?
2026-07-27Ordinance 26-11, ETJ extension
Adopted 5-0.
City of LytleNot yet archived. Have it?
2026-05-11Ordinance 26-10, Chapter 312 tax abatement policy
The city policy any abatement would be granted under.
City of LytleNot yet archived. Have it?
2024-11-25Ordinance 24-28, data center definition and Industrial district use
Makes a data center an allowed use in the zoning district requested.
City of LytleNot yet archived. Have it?
Rowan Lytle LLC application for Reinvestment Zone No. 2
Referred to in the notice; the application itself has not been obtained.
City of LytleNot yet archived. Have it?
Voluntary annexation petition, Rowan Lytle LLC
Referred to in the notice; not obtained.
City of LytleNot yet archived. Have it?
Project Pirate factsheet
Developer's timeline: announced September 2026, hearings October 2026, construction 2027 to 2028.
Rowan Digital InfrastructureOpen
Chapter 312 reinvestment zone registry (statewide data file)
Checked 2026-11-26: no entry for Rowan, Cinco or any City of Lytle zone.
Texas ComptrollerOpen
Chapter 312 abatement agreement registry (statewide data file)
Checked 2026-11-26: no Rowan entry.
Texas ComptrollerOpen
Local Development Agreement Search
Search front end for the registries above.
Texas ComptrollerOpen

Meetings

Every public meeting where the project came up: agenda, minutes and recording.

DateDocumentFromLink
2026-11-23City Council meeting agenda
Agenda lists an executive session discussion of Project Pirate. The outcome has not been reviewed yet.
City of LytleOpen
2026-11-23City Council meeting minutesCity of LytleNot yet archived. Have it?
2026-11-23City Council meeting recordingCity of Lytle (YouTube)Watch
2026-11-09City Council meeting agenda
Residents asked the council not to vote on annexation or rezoning. Council discussed Project Pirate in executive session and took no action.
City of LytleOpen
2026-11-09City Council meeting minutesCity of LytleOpen
2026-11-09City Council meeting recording (item begins at 0:05:42)City of Lytle (YouTube)Watch
2026-10-26City Council meeting agenda
Residents spoke on the project during public comment. Council discussed Project Pirate in executive session and took no action.
City of LytleOpen
2026-10-26City Council meeting minutesCity of LytleOpen
2026-10-26City Council meeting recording (item begins at 0:16:11)City of Lytle (YouTube)Watch
2026-10-19City Council special meeting agenda
Three public hearings: annexation, rezoning to Industrial, and Reinvestment Zone No. 2. 26 people spoke and none favored the project, according to Devine News. No vote was taken.
City of LytleNot yet archived. Have it?
2026-10-19City Council special meeting minutesCity of LytleNot yet archived. Have it?
2026-10-19City Council special meeting recording (item begins at 0:44:13)City of Lytle (YouTube)Watch
2026-10-14Planning and Zoning Commission meeting agenda
Public hearing on rezoning 284.04 acres to Industrial; every speaker was opposed or wanted more information. With three of five members present, the commission voted to recommend denial.
City of LytleOpen
2026-10-14Planning and Zoning Commission meeting minutesCity of LytleNot yet archived. Have it?
2026-10-14Planning and Zoning Commission meeting recording (item begins at 0:00:03)City of Lytle (YouTube)Watch
2026-10-12City Council meeting recording (item begins at 1:20:24)
Mayor announced the October 19 public hearing on Project Pirate.
City of Lytle (YouTube)Watch
2026-09-28City Council meeting agenda
Residents asked during public comment whether data centers would take city water and whether the water rate increase was tied to them.
City of LytleOpen
2026-09-28City Council meeting minutesCity of LytleNot yet archived. Have it?
2026-09-28City Council meeting recording (item begins at 0:02:26)City of Lytle (YouTube)Watch
2026-09-14City Council meeting agenda
Set a special meeting for October 19 at the Community Center for the public hearings (4-0).
City of LytleOpen
2026-09-14City Council meeting minutesCity of LytleOpen
2026-09-14City Council meeting recording (item begins at 1:15:25)City of Lytle (YouTube)Watch
2026-08-24City Council meeting agenda
Resolution 26-40 hired Kimley-Horn to review the Project Pirate site development plan, with the cost passed to the developer (5-0). First appearance of the name on an agenda.
City of LytleOpen
2026-08-24City Council meeting minutesCity of LytleOpen
2026-08-24City Council meeting recording (item begins at 0:25:04)City of Lytle (YouTube)Watch
2026-07-27City Council meeting agenda
Ordinance 26-11 extended the ETJ, on Rowan Lytle LLC's petition, to take in a corner of the site an earlier action had left out (5-0).
City of LytleOpen
2026-07-27City Council meeting minutesCity of LytleOpen
2026-07-27City Council meeting recording (item begins at 2:06:21)City of Lytle (YouTube)Watch
2026-05-11City Council meeting agenda
Public hearing on the tax abatement policy drew no comments. Ordinance 26-10 adopted the policy (5-0).
City of LytleOpen
2026-05-11City Council meeting minutesCity of LytleOpen
2026-05-11City Council meeting recordingCity of Lytle (YouTube)Watch
2026-04-27City Council meeting agenda
Ordinance 26-08 re-adopted the Chapter 312 tax abatement policy. Staff said the city expected to be approached later in the year (5-0).
City of LytleOpen
2026-04-27City Council meeting minutesCity of LytleOpen
2026-04-27City Council meeting recording (item begins at 0:48:12)City of Lytle (YouTube)Watch
2024-11-25City Council meeting agenda
Public hearing drew no comments. Ordinance 24-28 adopted the data center definition and made data centers an allowed use in Industrial zoning (5-0).
City of LytleOpen
2024-11-25City Council meeting minutesCity of LytleOpen
2024-11-25City Council meeting recording (item begins at 0:34:31)City of Lytle (YouTube)Watch
2024-11-18Planning and Zoning Commission special meeting agenda
Public hearing on adding a "data center" definition and allowing data centers in the Industrial zoning district. Recommended approval by voice vote. Staff said developers had asked for the change.
City of LytleOpen
2024-11-18Planning and Zoning Commission special meeting minutesCity of LytleNot yet archived. Have it?
2024-11-18Planning and Zoning Commission special meeting recording (item begins at 0:03:03)City of Lytle (YouTube)Watch

Appraisal district records

The county appraisal district page for each parcel: owner, value, deed history.

DateDocumentFromLink
Medina CAD property 7865
2.36 acres, A0820 G. Rissman Survey 450 1/2. Owner of record: Rowan Lytle LLC.
Medina Central Appraisal DistrictOpen
Medina CAD property 7868
25.0 acres, A0820 G. Rissman Survey 450 1/2. Owner of record: Rowan Lytle LLC.
Medina Central Appraisal DistrictOpen
Medina CAD property 7809
129.21 acres, A0817 H. Ransing Survey 517. Owner of record: Rowan Lytle LLC.
Medina Central Appraisal DistrictOpen
Medina CAD property 83866
127.47 acres, A1444 M. Denson Survey 449. Owner of record: Rowan Lytle LLC.
Medina Central Appraisal DistrictOpen
Medina CAD property 516178
4.06 acres, A0817 H. Ransing Survey 517. Owner of record: Rowan Lytle LLC.
Medina Central Appraisal DistrictOpen

News and company statements

Reporting and press releases. These are not public records; they are context and leads.

DateDocumentFromLink
2026-11-25Suggested "de-annexation" of data center from ESD4 discussed by boardDevine NewsRead
2026-11-12Lytle Council Approves Sewer Agreement for Project Cinco Data Center
Says the city and Rowan have been revising the development agreement since Oct. 26.
Dockline MagazineRead
2026-11-11Data center sewer agreement approved by Lytle council
Describes annexation and zoning of the 284-acre site as a pending decision.
Devine NewsRead
2026-11-04"Catastrophic failure" results in 7 hour outage in Coalmine area
AEP said the outage was not caused by Rowan or its activities.
Devine NewsRead
2026-10-21Data center annexation, zoning draws heat during Lytle special hearingsDevine NewsRead
2026-10-21New road marks a milestone
Rowan building Carroll Farm Road for the Coal Mine neighborhood.
Devine NewsRead
2026-10-17Lytle Sets Oct. 19 Hearings for Proposed Data Center Site, Oct. 26 Tax Abatement ConsiderationMy Neighborhood NewsRead
2026-10-07SPECIAL DATA CENTER MEETING COMING UP-LytleDevine NewsRead
2026-09-23Engineering work on railroad improvements near Lytle data center approved by county
Union Pacific engineering near CR 683 and SH 132, reimbursed by Rowan Lytle LLC.
Devine NewsRead
2026-09-16SPECIAL DATA CENTER MEETING COMING UPDevine NewsRead
Rowan in Medina County: ProjectsRowan Digital InfrastructureOpen
Rowan in Medina County: FAQsRowan Digital InfrastructureOpen
Rowan in Medina County: CommunityRowan Digital InfrastructureOpen

Timeline

  1. Texas Commission on Environmental Quality. State registry shows an active construction stormwater permit for a site named Project Pirate, held by Turner Construction. The permit does not name Rowan; the match rests on the project name and location. Source
  2. Lytle City Council. Residents asked the council not to vote on annexation or rezoning. Council discussed Project Pirate in executive session and took no action.
  3. Lytle City Council. Residents spoke on the project during public comment. Council discussed Project Pirate in executive session and took no action.
  4. Lytle City Council. Three public hearings: annexation, rezoning to Industrial, and Reinvestment Zone No. 2. 26 people spoke and none favored the project, according to Devine News. No vote was taken. Source
  5. Lytle Planning and Zoning Commission. Public hearing on rezoning 284.04 acres to Industrial; every speaker was opposed or wanted more information. With three of five members present, the commission voted to recommend denial.
  6. City of Lytle. Economic Development Forum at the Community Center, where the project was discussed.
  7. City of Lytle. Published notices for voluntary annexation, rezoning to Industrial and Reinvestment Zone No. 2. Source
  8. Lytle City Council. Set a special meeting for October 19 at the Community Center for the public hearings (4-0). Source
  9. Lytle City Council. Resolution 26-40 hired Kimley-Horn to review the Project Pirate site development plan, with the cost passed to the developer (5-0). First appearance of the name on an agenda.
  10. Lytle City Council. Ordinance 26-11 extended the ETJ, on Rowan Lytle LLC's petition, to take in a corner of the site an earlier action had left out (5-0).

See an error or have a document that belongs here? Tell us.