Proposed · decisions still openTexas Energy Group · Record updated 2026-11-26
Draft record. This page has not yet been checked line by line against the source documents. Treat it as a lead, not a citation.
Texas Energy Group, a power developer, proposes a data center campus of eight or nine buildings with its own natural gas power plant and substation on a 525.5-acre ranch on Highway 132 south of Devine. The company says the campus would need 800 megawatts, about half generated on site, and that a hyperscale operator it has not named would eventually own it. Medina County commissioners approved the preliminary plat on November 16, 2026; a final plat is still required before construction.
Where this stands and what you can do
No final local approval is on record. This is when residents have the most say: hearings and votes on annexation, zoning, tax breaks and utility agreements are still ahead.
Ask for conditions before any vote. A city or county that is asked for annexation, zoning, utilities or a tax break can attach terms: a water cap with annual reporting, noise limits, setbacks from homes, limits on generator testing hours. Ask for them in writing and ask that the draft agreement be posted before the vote.
A letter you can copy: ask for conditions before a vote
Send to: Mayor and council members. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.
Subject: Project El Camino - conditions before any vote
Dear Mayor and Council Members,
I live in [neighborhood / street] and I am writing about Project El Camino (Texas Energy Group).
I am not asking you to turn away investment. I am asking that no annexation, zoning change, utility agreement or tax abatement for this project be approved until the following are written into the ordinance or the agreement itself:
1. Water: a cap on annual water use, stated in acre-feet, with a yearly public report of actual use.
2. Noise: a limit measured at the property line, and set hours for testing backup generators.
3. Distance: a minimum setback and a buffer between the buildings, the generators and the nearest homes.
4. Power: disclosure of any on-site power plant or generators, and the air permits they will need.
5. Money: any tax abatement tied to a minimum investment, a jobs and wage floor, and a clawback if those are missed.
6. Transparency: the draft agreement posted publicly at least [14] days before the vote.
Please tell me which of these the current draft includes, and when the public will be able to read it.
Thank you,
[Name]
[Address]
[Phone or email]
Speak or write on the tax abatement. A tax abatement is a choice, not an obligation. Ask the body considering one to deny it, shorten it, or tie it to jobs, wages and a clawback if promises are missed.
Send to: The body considering the abatement (city council or commissioners court). Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.
Subject: Tax abatement for Project El Camino
Dear [Mayor and Council Members / Judge and Commissioners],
I am writing about the tax abatement requested for Project El Camino (Texas Energy Group).
A tax abatement is your decision to make; state law does not require one. Before you vote, I ask that you:
1. State publicly the percentage, the number of years, and the dollar value of the taxes that would be forgiven.
2. Compare the request with what other Texas cities and counties have granted for similar projects.
3. Require a minimum investment, a minimum number of full-time jobs at a stated wage, and repayment if those terms are not met.
4. Require an annual compliance report, posted publicly.
5. Explain what Devine and Medina County receive in return, and when.
If these terms cannot be met, I ask that you vote no.
Thank you,
[Name]
[Address]
Comment on state permits. Backup generators and on-site power plants need air authorizations from the state environmental agency. Some types take public comment; all can be the subject of a complaint.
Ask the state for rules that apply everywhere. Outside city limits, Texas counties have little power over what gets built. Changing that takes the Legislature.
A letter you can copy: write to your state senator and representative
Send to: Your Texas state senator and state representative. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.
Subject: Data center siting and reporting standards - Medina County
Dear [Senator / Representative] [Name],
I am your constituent in Medina County, where Project El Camino (Texas Energy Group) is [proposed / being built / operating] near homes.
I support data centers being built in Texas. My concern is where and how fast. Outside city limits, counties have almost no say, and neighbors learn the terms after the vote. I ask that you support legislation that would:
1. Give counties authority to set reasonable siting standards for large data centers: setbacks from homes and schools, noise limits, and limits on on-site power generation near neighborhoods.
2. Require data centers above a set size to report their water and electricity use each year, publicly.
3. Require that tax abatement and development agreements with data centers be posted before the vote, not after.
4. Require air permits and pollution controls to be in place before on-site turbines and generators run.
Please tell me your position on these, and whether a bill addressing them is filed or planned.
Thank you,
[Name]
[Address - so your office can confirm I am a constituent]
El Camino Subdivision; El Camino data center; Devine Data Center / Power Plant
Location
State Highway 132 South, south of Devine near I-35; a second entrance is planned off FM 2200
Jurisdiction
Unincorporated Medina County, Commissioner Precinct 4, about half a mile south of the Devine city limits. Not annexed; the developer asked the City of Devine about annexation in spring 2026 and no annexation action is on the record. The plat places the site in Devine ISD.
Site
525.5 acres
Power
800 MW
Investment
Devine News called it a $28 billion project on 2026-11-18 without naming who gave the figure. Developer representatives told city officials it would be "the largest private investment in South Texas" (Devine News, 2026-05-06). The county plat states no dollar figure.
Water
The preliminary plat (August 2026) names Yancey Water Supply Corporation as water provider, and the developer told commissioners on 2026-11-16 that industrial water agreements had been negotiated with Yancey WSC. The developer described closed-loop cooling with a one-time fill of 1.7 million gallons (town hall, 2026-05-12) and of about 1 million gallons (Commissioners Court, 2026-11-16), with about 2% annual evaporation. In May 2026 the City of Devine said the developer had asked it for water and sewer through a 2-inch meter. The plat says wastewater will go to on-site sewage facilities.
Ordinances, resolutions, agreements, notices, permits and filings.
Date
Document
From
Link
2026-11-16
Preliminary plat of El Camino Subdivision (Project El Camino), 5 sheets, in the Commissioners Court agenda packet, PDF pages 317-322
Plat dated August 2026, job no. 3580.00. 525.50 acres in two lots (198.26 and 327.24 acres) and two phases, with proposed detention ponds. Plat notes: electric service by on-site electricity generation; water service by Yancey Water Supply Corporation; on-site sewage facilities; Devine ISD; part of the tract is in FEMA flood zones A and AE; maximum impervious cover 86.55 acres per lot. The owner's certificate is signed by an individual landowner, not a company. The file is about 100 MB.
Medina County; prepared by Matkin Hoover Engineering & Surveying
Project No. 58317, Implementation of Senate Bill 6, item 82: public comments of a Medina County resident
A resident's comment listing seven Medina County data center projects. It gives El Camino as 525 acres, 800 MW of demand and a 400 MW gas-fired plant. Not a filing by the developer or a utility.
Not yet filed as of 2026-11-26. Plat note 7 bars any structure or development until the Commissioners Court approves a final plat and it is recorded. The developer said drainage calculations will come with the final plat.
Yancey Water Supply Corporation industrial water agreement
Not obtained. The developer told the Commissioners Court on 2026-11-16 that industrial water supply agreements had been negotiated with Yancey WSC (Devine News, 2026-11-18).
Checked 2026-11-26: a search for regulated entities named "El Camino" in Medina County returned no results. No air permit for the gas plant and no stormwater registration was found. A search by the developer's name could not be completed.
Checked 2026-11-26: no El Camino, Texas Energy Group or Devine entry. No tax abatement or reinvestment zone for the site appears on any Medina County or City of Devine agenda.
Every public meeting where the project came up: agenda, minutes and recording.
Date
Document
From
Link
2026-11-16
Commissioners Court regular meeting agenda
Item 13: "Discuss and take possible action to approve a preliminary plat establishing Project El Camino; located in Precinct 4 on State Hwy 132 S (Matkin Hoover Engineering)." Submitted by Commissioner Danny Lawler. The item does not use the words data center.
Appointment approved 5-0. Records the consultant's remarks on roads, a developer-paid professional services agreement, and two residents' comments. The city's archive page labels this file as the July 21 minutes.
The city's meeting video player lists "Data Center Town Hall Meeting - May 12, 2026" (about 3 hours 20 minutes). Pick it from the playlist; the page has no direct link.
The county appraisal district page for each parcel: owner, value, deed history.
Date
Document
From
Link
Medina CAD property record for the 525.5-acre tract
Not obtained; the district's property search sits behind a bot check. The plat describes the tract as a called 524.574 acres, Tract 1, recorded in Volume 239, Page 141 of the Medina County deed records, in the M. Jeffers, W.M. Stewart, N. Gerandino, O.M. Seacrest and D. Lewis surveys. As of the August 2026 plat the owner of record was an individual, not a company.
Reporting and press releases. These are not public records; they are context and leads.
Date
Document
From
Link
2026-11-18
County leaders approve preliminary plat for Devine Data Center / Power Plant
Source of the $28 billion figure, the unanimous vote, the FM 2200 second entrance, the Yancey WSC water agreements and the 1 million gallon fill. Full text is behind the paywall.
Data center meeting draws capacity crowd to Devine community center
Town hall report: 800 MW, half from the grid and half from an on-site gas plant; 8-9 buildings; 1.7 million gallon initial fill; the developer says it holds "developer rights" and a hyperscaler will eventually own the property. Full text is behind the paywall.
Data center & power plant proposal said to be "largest investment in South Texas"
City officials say the developer asked about annexation for water and sewer with a 2-inch meter, and already knew of a gas line and transfer station on the property. Full text is behind the paper's paywall.
Exciting Announcement from TEG: The "El Camino" Project
Describes an 800 MW development with 400 MW of gas generation and 400 MW of grid capacity, a high-pressure gas line, high-voltage line access, "reliable municipal water supply" and "no zoning restrictions". The company's own news page does not mention the project.
Texas Energy Group (LinkedIn post by co-founder Ryan Nuckolls)
Medina County Commissioners Court. Approved the preliminary plat establishing Project El Camino (agenda item 13). Devine News reported a unanimous vote by Commissioners Lawler, Sittre, Lynch and Castiglione. Source
Devine City Council. Special meeting. Appointed Terry Page, a former Microsoft employee the city described as retired, as the city's data center consultant (5-0). The city administrator confirmed a professional services agreement would have the developer pay for the city's consultants. Council said negotiations were only beginning. Source
Devine City Council. Voted to retain the law firm Greenberg Traurig, LLP for data center representation (5-0). Source
Medina County Commissioners Court. County Judge Keith Lutz said the court's authority over data centers is limited to what state law and the constitution grant, citing the May 12 town hall on El Camino. No action item. Source
City of Devine. Town hall at the Devine community center with the city council, planning and zoning commission and two county officials. Ryan Nuckolls of Texas Energy Group presented the plan. About 60 people signed up to speak. No vote was taken. Source
City of Devine. Devine News reported that the mayor and city administrator said an unnamed developer had asked the city about annexation, water and sewer service, and that the city has no say over whether the data center is built because the land is outside city limits. Source
Texas Energy Group. Co-founder Ryan Nuckolls announced the "El Camino" project on LinkedIn as an 800 MW development in the greater San Antonio area with 400 MW of gas generation and 400 MW of grid capacity. The post did not name Devine. Source
See an error or have a document that belongs here? Tell us.