Guadalupe County / San Marcos /

Palomino Alpha

Proposed · decisions still openYarrington Land · Record updated 2026-11-27

Draft record. This page has not yet been checked line by line against the source documents. Treat it as a lead, not a citation.

A proposed multi-building data center campus on ranch land at Zorn, beside the LCRA Zorn substation, put together by Austin land firm Yarrington Land through Palomino Alpha, LLC. Guadalupe County granted a ten-year tax abatement in December 2024 and a development agreement in April 2025, and enlarged both to 942.29 acres in February 2026; the water service agreement, the wastewater permit and a lawsuit filed July 20, 2026 against the county are unresolved. The latest dated sources are a San Marcos Daily Record report of October 22, 2026, in which a water district director said the matter seemed dormant for the time being, and ERCOT's report of November 2, 2026, which still lists the company's five gas-fired generation requests at Zorn. Size is stated differently by source: about 365 acres (2025 development agreement), 438.2 acres (2024 zone), about 870 acres (June 2026 water agreement draft; later drafts say about 942) and 942.29 acres (2026 zone); a minimum of 200 MW (abatement agreement), 360 MW (court discussion, March 2025), 480 MW (the company's October 2024 abatement application) and 2,000.5 MW of on-site gas generation requested from ERCOT.

Where this stands and what you can do

No final local approval is on record. This is when residents have the most say: hearings and votes on annexation, zoning, tax breaks and utility agreements are still ahead.

  1. Ask for conditions before any vote. A city or county that is asked for annexation, zoning, utilities or a tax break can attach terms: a water cap with annual reporting, noise limits, setbacks from homes, limits on generator testing hours. Ask for them in writing and ask that the draft agreement be posted before the vote.

    City council: we do not have a verified contact page for this one yet. Its website will list the members.

    A letter you can copy: ask for conditions before a vote

    Send to: Mayor and council members. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Palomino Alpha - conditions before any vote
    
    Dear Mayor and Council Members,
    
    I live in [neighborhood / street] and I am writing about Palomino Alpha (Yarrington Land).
    
    I am not asking you to turn away investment. I am asking that no annexation, zoning change, utility agreement or tax abatement for this project be approved until the following are written into the ordinance or the agreement itself:
    
    1. Water: a cap on annual water use, stated in acre-feet, with a yearly public report of actual use.
    2. Noise: a limit measured at the property line, and set hours for testing backup generators.
    3. Distance: a minimum setback and a buffer between the buildings, the generators and the nearest homes.
    4. Power: disclosure of any on-site power plant or generators, and the air permits they will need.
    5. Money: any tax abatement tied to a minimum investment, a jobs and wage floor, and a clawback if those are missed.
    6. Transparency: the draft agreement posted publicly at least [14] days before the vote.
    
    Please tell me which of these the current draft includes, and when the public will be able to read it.
    
    Thank you,
    [Name]
    [Address]
    [Phone or email]
  2. Speak or write on the tax abatement. A tax abatement is a choice, not an obligation. Ask the body considering one to deny it, shorten it, or tie it to jobs, wages and a clawback if promises are missed.

    Contact: Guadalupe County Commissioners Court

    A letter you can copy: comment on a tax abatement

    Send to: The body considering the abatement (city council or commissioners court). Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Tax abatement for Palomino Alpha
    
    Dear [Mayor and Council Members / Judge and Commissioners],
    
    I am writing about the tax abatement requested for Palomino Alpha (Yarrington Land).
    
    A tax abatement is your decision to make; state law does not require one. Before you vote, I ask that you:
    
    1. State publicly the percentage, the number of years, and the dollar value of the taxes that would be forgiven.
    2. Compare the request with what other Texas cities and counties have granted for similar projects.
    3. Require a minimum investment, a minimum number of full-time jobs at a stated wage, and repayment if those terms are not met.
    4. Require an annual compliance report, posted publicly.
    5. Explain what San Marcos and Guadalupe County receive in return, and when.
    
    If these terms cannot be met, I ask that you vote no.
    
    Thank you,
    [Name]
    [Address]
  3. Comment on state permits. Backup generators and on-site power plants need air authorizations from the state environmental agency. Some types take public comment; all can be the subject of a complaint.

    Contact: TCEQ: comment on a pending permit · TCEQ: environmental complaint

  4. Ask for the documents. The agreement, the application and the studies are public records. Request them now, while they can still inform a vote.

    Contact: How to file a public information request

  5. Ask the state for rules that apply everywhere. Outside city limits, Texas counties have little power over what gets built. Changing that takes the Legislature.

    Contact: Who Represents Me (Texas Legislature) · Office of the Texas Governor

    A letter you can copy: write to your state senator and representative

    Send to: Your Texas state senator and state representative. Fill in the brackets, cut what does not apply, and say it in your own words where you can. A short letter from a neighbor carries more weight than a form.

    Subject: Data center siting and reporting standards - Guadalupe County
    
    Dear [Senator / Representative] [Name],
    
    I am your constituent in Guadalupe County, where Palomino Alpha (Yarrington Land) is [proposed / being built / operating] near homes.
    
    I support data centers being built in Texas. My concern is where and how fast. Outside city limits, counties have almost no say, and neighbors learn the terms after the vote. I ask that you support legislation that would:
    
    1. Give counties authority to set reasonable siting standards for large data centers: setbacks from homes and schools, noise limits, and limits on on-site power generation near neighborhoods.
    2. Require data centers above a set size to report their water and electricity use each year, publicly.
    3. Require that tax abatement and development agreements with data centers be posted before the vote, not after.
    4. Require air permits and pollution controls to be in place before on-site turbines and generators run.
    
    Please tell me your position on these, and whether a bill addressing them is filed or planned.
    
    Thank you,
    [Name]
    [Address - so your office can confirm I am a constituent]

This is general information about how local and state decisions get made, not legal advice.Who decides what, and every contact and letter in one place.

Legal entities
Palomino Alpha, LLC; Yarrington Land Holdings, LLC
Also known as
Palomino Alpha Reinvestment Zone #1; Palomino Alpha WWTP; Alpha Power (ERCOT generation requests); Palamino Alpha (spelling in some county records)
Location
West side of State Highway 123 near FM 1979 at Zorn, southwest of the LCRA Zorn substation; east of Center Point Road, south of Braune Road and north of Dreibrodt Road. Charles Henderson Survey, Abstract 147.
Jurisdiction
Unincorporated Guadalupe County, Commissioner Precinct 2. The development agreement says the property is not within any city's limits or extraterritorial jurisdiction. The site is at Zorn, an unincorporated community; the TCEQ application gives the address as San Marcos, Texas 78666 and names Zorn as the nearest place. Seguin is the county seat.
Site
942.29 acres
Investment
The county's January 23, 2026 notice estimates the improvements at $600,000,000+. The December 2024 abatement agreement requires at least $400,000,000 in total and $125,000,000 per phase.
Water
Crystal Clear SUD's draft service agreement (June 2026) is for 0.05 million gallons per day at first, rising to 0.5 million gallons per day at full buildout; the board has not voted on it. The company's TCEQ application (March 2026) seeks to discharge up to 500,000 gallons per day of treated wastewater, 90% of it from cooling. A speaker at the district's July 23, 2026 meeting said records she had obtained showed the request could grow to 2.3 million gallons per day (San Marcos Daily Record); no document seen for this record states that figure.

Tax incentives

Granted byTermsDate
Guadalupe CountyChapter 312 tax abatement on improvements for ten years per building: 90% for years 1-5, then 80%, 70%, 60%, 50% and 40%. Conditions include a minimum 200 MW campus, $400,000,000 minimum investment ($125,000,000 per phase) and 50 jobs. Amended February 24, 2026 to cover the 942.29-acre zone and to move the construction start deadline to December 31, 2027.2024-12-17
Guadalupe CountyDevelopment agreement with a ten-year term: vested development rules, no county moratorium on the property, and (since the February 24, 2026 amendment) the right to build on-site power generation including natural-gas-fired units. It takes effect once the owner closes on the land.2025-04-15

Documents and sources

81 items: Government records (32) · Meetings (28) · Appraisal district records (1) · News and company statements (20)

Government records

Ordinances, resolutions, agreements, notices, permits and filings.

DateDocumentFromLink
2026-11-02Generator Interconnection Status (GIS) Report, October 2026
Spreadsheet. Lists five requests by Palomino Alpha, LLC at the 345 kV Zorn substation: Alpha Power Phase 1 through Phase 5 (28INR0532, 29INR0363, 30INR0143, 31INR0025, 32INR0007), gas turbines of 400.1 MW each, projected to start operating at the end of 2028, 2029, 2030, 2031 and 2032. Phase 1 shows a full interconnection study requested 2026-07-01 and a screening study completed 2026-10-06; no interconnection agreement signed. These are power plants, not the data center's load.
ERCOTOpen
2026-10-13Chapter 312 reinvestment zone registry (statewide data file)
Record 000022863, reported by Guadalupe CAD: "Palomino Alpha Reinvestment Zone 1", active, 942 acres, effective 02/24/2026, expires 12/03/2029, submitted 10/13/2026.
Texas ComptrollerOpen
2026-08-03Generator Interconnection Status (GIS) Report, July 2026
The first monthly report to list the five Alpha Power requests. The February through June 2026 reports do not list them.
ERCOTOpen
2026-07-20Original petition, Data Center Action Coalition and three residents v. Guadalupe County, the Commissioners Court and its members
Cause No. 26-2397-CV-C. A file-stamped copy was read for this site's CloudBurst record; it is not linked because it contains the plaintiffs' home addresses. Filing reported by the Seguin Gazette, Seguin Today, Community Impact, KSAT and the San Marcos Record.
District Court of Guadalupe CountyNot yet archived. Have it?
2026-05-11Palomino Alpha Data Center Feasibility Study
Not obtained. Cited as Exhibit D of the draft water agreement; the exhibit pages in the posted packets are blank. A district director said in October 2026 that the study had expired (San Marcos Record).
M&S Engineering for Crystal Clear Special Utility DistrictNot yet archived. Have it?
2026-04-22Notice of Receipt of Application and Intent to Obtain Water Quality Permit, proposed permit WQ0005514000
Copy posted by Guadalupe County on April 28, 2026. Discharge route: an unnamed tributary, Soil Conservation Service Site 7 Reservoir, York Creek, then the Lower San Marcos River. The plant site is about 0.4 miles southwest of State Highway 123 and FM 1979. The application was declared administratively complete; the public comment deadline is set by a later notice.
Texas Commission on Environmental QualityOpen
2026-03-16TPDES application WQ0005514000, administrative package (Palomino Alpha WWTP)
165 pages. New industrial wastewater permit for a 500,000 gallon-per-day activated sludge plant, prepared by Kimley-Horn. The application says 90% of the wastewater will come from cooling the data centers and 10% from offices, that cooling towers will discharge blowdown (number of towers "TBD"), and that the flow may contain reverse-osmosis reject. Customer number CN606482925, regulated entity RN112394127. Applicant contacts use Yarrington Land email addresses. Includes TCEQ's March 26, 2026 notice of deficiency and the applicant's response.
Texas Commission on Environmental QualityOpen
2026-02-24Order expanding Palomino Alpha Reinvestment Zone #1 (title spelled "Palamino")
Attachment A: 942.29 acres in 20 parcels with the owner of record for each, plus two right-of-way easements. Four of the parcels, 186.39 acres together, are listed under the County Judge's surname: two (10.10 acres) under the Judge and his spouse, and two (176.29 acres) under another owner. The order does not state the relationship; the Judge told the court on February 24, 2026 that his own and family property is in the project. The zone's expiration date stays five years from December 3, 2024. Recites newspaper notice in the Seguin Gazette of February 14-15, 2026.
Guadalupe CountyOpen
2026-02-24First Amendment to the Tax Abatement Agreement between Guadalupe County and Palomino Alpha, LLC
Moves the deadlines: construction to begin by December 31, 2027, first phase complete by December 31, 2029, all phases by December 31, 2034. Adds the zone expansion order as Exhibit D. Agenda copy, unsigned.
Guadalupe CountyOpen
2026-02-24First Amendment to the Development Agreement with Palomino Alpha, LLC
Changes the property from about 365 acres to about 940 acres and adds Section 3.08, giving the owner the right to build on-site power generation, including natural-gas-fired units, fuel lines, substations and battery storage. Agenda copy, unsigned.
Guadalupe CountyOpen
2026-02-24Executed copies of the tax abatement agreement amendment and development agreement amendment
Not obtained. The copies posted with the agenda are unsigned.
Guadalupe CountyNot yet archived. Have it?
2026-02-11Public Hearing Notice: designation or expansion of a Guadalupe County reinvestment zone
Posted on the county's Public Notices page. Sets the February 24, 2026 hearing and lists the 20 appraisal district parcel IDs in the 942.29-acre zone: 64307, 64243, 140259, 149858, 139579, 166583, 64129, 64186, 64149, 64150, 64245, 199373, 64278, 186569, 64174, 64190, 64191, 64192, 64193 and 64144, plus a right-of-way easement.
Guadalupe CountyOpen
2026-01-23Notice under Tax Code 312.207: tax abatement agreement with Palomino Alpha, LLC
Names Palomino Alpha, LLC as property owner and applicant; Palomino Alpha Reinvestment Zone #1, 942.29 acres in Precinct 2; a multi-building data center campus; estimated cost of improvements $600,000,000+.
Guadalupe CountyOpen
2025-04-15Palomino Alpha-Guadalupe County Development Agreement, updated April 10, 2025
The version approved April 15, 2025. About 365 acres on the west side of State Highway 123, outside any city limits or extraterritorial jurisdiction. The gas power plant wording is removed. Water from Crystal Clear SUD, on-site sewage facilities, electricity from LCRA (wholesale) and Guadalupe Valley Electric Cooperative (retail). The county agrees not to impose a moratorium on the property during the ten-year term. The signature block reads Palomino Alpha, LLC, by Yarrington Land Holdings, LLC, its managing member, by Matt Hainline, manager. Exhibit A lists nine parcel IDs.
Guadalupe CountyOpen
2025-03-25Palomino Alpha Development Agreement, draft presented March 25, 2025
The version that failed 2-2. It defines the project as an industrial data center, combined cycle natural gas power plant and related improvements on about 365 acres.
Guadalupe CountyOpen
2024-12-17Tax Abatement Agreement between Guadalupe County and Palomino Alpha, LLC
The original agreement is attached as Exhibit One to the February 2026 amendment packet (scanned; this link is that packet). Terms: a multi-building data center campus with a minimum 200 MW capacity; minimum new investment of $400,000,000 and at least $125,000,000 per phase; at least 50 jobs; construction to begin by December 31, 2026; ten years of abatement per building at 90% for years 1-5, then 80%, 70%, 60%, 50% and 40%; lateral road tax not abated. Signed for Palomino Alpha, LLC by Matt Hainline as manager.
Guadalupe CountyOpen
2024-12-03Order No. 20241203-8A designating Palomino Alpha Reinvestment Zone #1 (title spelled "Palamino")
Scanned order with Attachment A: 438.2 acres in 11 appraisal district parcels plus two right-of-way easements, Charles Henderson Survey, Abstract 147. Five-year designation, renewable. Recites newspaper notice in the Seguin Gazette of November 23-24, 2024.
Guadalupe CountyOpen
2024-11-12Resolution No. 11122024-7E: Guidelines and Criteria for Tax Abatements in Reinvestment Zones, with application form and compliance report
The county's abatement policy, adopted 5-0 three weeks before the Palomino Alpha zone was designated. The zone order and the abatement agreement both cite it. Agenda attachment; the link redirects to the county's Granicus file server.
Guadalupe CountyOpen
Abatement Notices page
Lists the Palomino Alpha notice dated 01/23/2026.
Guadalupe CountyOpen
Memorandum of Development Agreement, recorded copy
Not obtained. The development agreement (Section 9.04) says a memorandum will be recorded in the county real property records. The agreement also says it takes effect only after the owner closes on the land and a deed is recorded.
Guadalupe County ClerkNot yet archived. Have it?
Commissioners Court meeting archive (agendas, minutes, video)
Every agenda and set of minutes from August 2024 through the December 1, 2026 agenda was downloaded and searched for Palomino, data center, reinvestment zone and abatement. Palomino Alpha items appear only at the meetings listed here. No item renewing the abatement guidelines appears on the November 3, November 17 or December 1, 2026 agendas.
Guadalupe County (Granicus)Open
Pending TPDES applications list
Checked 2026-11-27: lists Palomino Alpha, LLC, Palomino Alpha WWTP, WQ0005514000, Guadalupe County, dated 4/22/2026, with only the administrative package posted. No technical package or draft permit is posted.
Texas Commission on Environmental QualityOpen
Central Registry: regulated entity RN112394127, Palomino Alpha WWTP
Not retrievable by automated request; open it in a browser. EPA's ECHO database lists two NPDES IDs for the Palomino Alpha WWTP, TX0149039 and TX0149110; the pending application carries TX0149110.
Texas Commission on Environmental QualityOpen
Commissioners' Integrated Database file for WQ0005514000 (comments, hearing requests, status)
Not obtained: the database refused automated requests. The notice says public comments and hearing requests are filed there under the permit number. No Notice of Application and Preliminary Decision, public meeting notice or hearing request was found by other means.
Texas Commission on Environmental QualityNot yet archived. Have it?
Large-load interconnection request for the data center
Not found. ERCOT does not publish large-load requests by project, and no LCRA or co-op board item naming the project was located.
ERCOT / LCRA Transmission Services / Guadalupe Valley Electric CooperativeNot yet archived. Have it?
Chapter 312 abatement agreement registry (statewide data file)
Checked 2026-11-27: no Palomino Alpha agreement among the 102 Guadalupe County rows.
Texas ComptrollerOpen
Data center registry
Checked 2026-11-27: no Palomino Alpha or Yarrington entry.
Texas ComptrollerOpen
Franchise tax account status: Palomino Alpha, LLC
Texas LLC, Secretary of State file number 0805687103, registered 08/28/2024, active. Mailing address 3801 N Capital of Texas Hwy, Austin. No officers listed.
Texas ComptrollerOpen
Franchise tax account status: Yarrington Land Holdings LLC
Texas LLC, Secretary of State file number 0803573695, registered 03/13/2020, active, same Austin street address. Lists Matthew Hainline as manager and director.
Texas ComptrollerOpen
PUC dockets
Not searched: the PUC Interchange search needs a control number, and none naming the project was found.
Public Utility Commission of TexasNot yet archived. Have it?
Yarrington: Palomino Alpha (tracker listing)
Third-party tracker with no sources cited. Lists 870 acres, a 2029 planned year and the status "In Doubt". Not used for any fact in this record.
BaxtelOpen
Palomino Alpha Data Center (tracker listing)
Third-party tracker. Lists 360 MW and 365 acres and dates a 2-2 development agreement vote to March 25, 2026. The county minutes show the 2-2 vote was on March 25, 2025 and that no Palomino Alpha item was on the court's March 2026 agendas.
Central Texas Data Center TrackerOpen

Meetings

Every public meeting where the project came up: agenda, minutes and recording.

DateDocumentFromLink
2026-10-22Board meeting packet, October 22, 2026
No Palomino Alpha item. Neither this agenda nor the November 2 and November 16, 2026 agendas lists the agreement.
Crystal Clear Special Utility DistrictOpen
2026-09-24Board meeting packet, September 24, 2026
No Palomino Alpha item on this agenda. Contains the August 27 minutes: the acting president said he had not been able to reach anyone at Palomino and invited the company to appear; counsel said no action could be taken because the item was posted for discussion only.
Crystal Clear Special Utility DistrictOpen
2026-08-27Board meeting packet, August 27, 2026
Item 5a: update and discussion of the Palomino Alpha agreement. Contains the July 23 minutes: speakers for and against, including one person who described his role in the development; "No action taken".
Crystal Clear Special Utility DistrictOpen
2026-07-23Board meeting packet, July 23, 2026
Update and discussion of the Palomino Alpha agreement, listed without possible action. Contains the June 3 minutes and the draft agreement.
Crystal Clear Special Utility DistrictOpen
2026-06-03Board meeting packet, June 3, 2026, with the draft Non-Standard Water Service Agreement for Palomino Alpha, LLC
Posted for update, discussion and possible action. The draft says the customer is developing about 870 acres made up of tracts owned by third parties with which it has purchase agreements; that it needs an estimated 0.5 million gallons per day at full buildout (1,667 living unit equivalents), starting at 0.05 million gallons per day, plus fire flow of 2,200 gallons per minute; and that a May 11, 2026 feasibility study by the district's engineer, M&S Engineering, found sufficient supply.
Crystal Clear Special Utility DistrictOpen
2026-06-03Board meeting minutes, June 3, 2026
A first motion to table the Palomino Alpha agreement failed 3-3. After an executive session from 6:32 to 7:57 p.m., a motion to table by Director Trant, seconded by Director Patterson, passed. A consultant for Palomino Alpha and the Guadalupe County Judge, identified as a landowner, spoke in public comment. Scanned.
Crystal Clear Special Utility DistrictOpen
2026-02-24Commissioners Court regular meeting agenda
Item 5: public hearing on the designation or expansion of Palomino Alpha Reinvestment Zone #1. Items 7B, 7C and 7D: the expansion order and the first amendments to the tax abatement and development agreements.
Guadalupe County Commissioners CourtOpen
2026-02-24Commissioners Court regular meeting minutes
Public hearing ran from 10:32 to 11:02 a.m.; speakers raised abatements, water use, missing information in public documents and when the land was sold. Judge Kutscher said he would run the meeting but not take part in the hearing or in items 7B-7D because his own and family property is in the project. A consultant for Palomino Alpha addressed the court. Each of the three items passed 3-1, with Ott, Engelke and Wolverton in favor, Germann against and Kutscher abstaining. The CloudBurst abatement failed 2-3 at the same meeting.
Guadalupe County Commissioners CourtOpen
2026-02-24Commissioners Court meeting recording, February 24, 2026 (public hearing 10:32 to 11:02 a.m. by the clock)
Full-meeting video file linked from the county's Granicus archive. Not watched for this record; the clock times in the title come from the minutes.
Guadalupe County (Granicus)Watch
2026-02-10Commissioners Court regular meeting agenda
Executive session items; the hearing date was set after the closed session.
Guadalupe County Commissioners CourtOpen
2026-02-10Commissioners Court regular meeting minutes
After an executive session from 11:55 a.m. to 1:11 p.m., Germann moved to set a February 24, 2026 public hearing on the designation or expansion of a county reinvestment zone, seconded by Engelke. Approved 4-0 with Judge Kutscher abstaining.
Guadalupe County Commissioners CourtOpen
2026-02-10Commissioners Court meeting recording, February 10, 2026 (motion followed the executive session that ended 1:11 p.m.)
Full-meeting video file linked from the county's Granicus archive. Not watched for this record; the clock times in the title come from the minutes.
Guadalupe County (Granicus)Watch
2025-04-15Commissioners Court regular meeting agenda
Item 7O: the Development Agreement with Palomino Alpha, LLC, with the version updated April 10, 2025 attached.
Guadalupe County Commissioners CourtOpen
2025-04-15Commissioners Court regular meeting minutes
Judge Kutscher said he would abstain and left the courtroom from 11:22 to 11:26 a.m. The county's attorney described the changes. Carpenter moved to approve, seconded by Ott. Approved 3-0 with one abstention (Germann); Kutscher was not present for the vote.
Guadalupe County Commissioners CourtOpen
2025-04-15Commissioners Court meeting recording, April 15, 2025 (item taken up 11:22 a.m. by the clock)
Full-meeting video file linked from the county's Granicus archive. Not watched for this record; the clock times in the title come from the minutes.
Guadalupe County (Granicus)Watch
2025-03-25Commissioners Court regular meeting agenda
Item 8D: the Development Agreement with Palomino Alpha, LLC.
Guadalupe County Commissioners CourtOpen
2025-03-25Commissioners Court regular meeting minutes
Judge Kutscher said he would abstain from discussion and vote. Carpenter moved to approve, seconded by Engelke. The motion failed 2-2, with Engelke and Germann voting no. Discussion notes: water and electricity concerns, more information needed, recycled water to be used, a power plant as backup for the site, and a "360 megawatt Data Center powered by LCRA".
Guadalupe County Commissioners CourtOpen
2025-03-25Commissioners Court meeting recording, March 25, 2025
Full-meeting video file linked from the county's Granicus archive. Not watched for this record; the clock times in the title come from the minutes.
Guadalupe County (Granicus)Watch
2024-12-17Commissioners Court regular meeting agenda
Item 8R: the Tax Abatement Agreement between Guadalupe County and Palomino Alpha, LLC. Item 10A: executive session under Government Code 551.087 (economic development negotiations).
Guadalupe County Commissioners CourtOpen
2024-12-17Commissioners Court regular meeting minutes
Item 8R: no action. One resident spoke in citizens' comments about tax incentives for data centers. After an executive session from 12:47 to 1:44 p.m., Seidenberger moved to approve the abatement (ten years: 90% for years 1-5, then 80%, 70%, 60%, 50%, 40%), seconded by Engelke. Approved 4-0, with Judge Kutscher abstaining. The minutes spell the company "Palamino Alpha, LLC".
Guadalupe County Commissioners CourtOpen
2024-12-17Commissioners Court meeting recording, December 17, 2024 (vote followed the executive session that ended 1:44 p.m.)
Full-meeting video file linked from the county's Granicus archive. Not watched for this record; the clock times in the title come from the minutes.
Guadalupe County (Granicus)Watch
2024-12-03Commissioners Court regular meeting agenda
Item 6: public hearing on designating Palomino Alpha Reinvestment Zone #1. Item 8A: Order No. 20241203-8A.
Guadalupe County Commissioners CourtOpen
2024-12-03Commissioners Court regular meeting minutes
Public hearing opened 11:16 a.m. and closed 11:19 a.m.; the only speaker recorded is the county's attorney. Item 8A approved 3-0 on a motion by Seidenberger, seconded by Carpenter. Four members were present; Engelke was absent. The minutes do not say who did not vote.
Guadalupe County Commissioners CourtOpen
2024-12-03Commissioners Court meeting recording, December 3, 2024 (public hearing 11:16 a.m. by the clock)
Full-meeting video file linked from the county's Granicus archive. Not watched for this record; the clock times in the title come from the minutes.
Guadalupe County (Granicus)Watch
2024-11-12Commissioners Court regular meeting agenda
Item 7E: resolution approving the county's Guidelines and Criteria for Tax Abatements in Reinvestment Zones.
Guadalupe County Commissioners CourtOpen
2024-11-12Commissioners Court regular meeting minutes
Item 7E approved 5-0 on a motion by Carpenter, seconded by Germann.
Guadalupe County Commissioners CourtOpen
2024-11-12Commissioners Court meeting recording, November 12, 2024
Full-meeting video file linked from the county's Granicus archive. Not watched for this record; the clock times in the title come from the minutes.
Guadalupe County (Granicus)Watch
Board meeting minutes, July 23 and August 27, 2026 (signed copies)
Not posted in the district's minutes archive as of 2026-11-27; draft minutes appear inside the following month's packet.
Crystal Clear Special Utility DistrictNot yet archived. Have it?

Appraisal district records

The county appraisal district page for each parcel: owner, value, deed history.

DateDocumentFromLink
Appraisal district records for the 20 parcels in the zone
Not obtained: the appraisal district's property search refused automated requests. Parcel IDs are listed in the county's February 11, 2026 hearing notice and, with owners of record, in the zone expansion order.
Guadalupe Appraisal DistrictNot yet archived. Have it?

News and company statements

Reporting and press releases. These are not public records; they are context and leads.

DateDocumentFromLink
2026-10-22Texas Rangers reviewing allegations against Guadalupe County judge
DPS said the request was received and under review. Crystal Clear director Joseph Benavides said by email that Palomino Alpha had not been on the agenda since August because its representatives asked that the water agreement be paused, that the feasibility study had expired, and that "it seems the Palomino Alpha matter is dormant, or has gone away."
San Marcos Daily RecordRead
2026-09-26Guadalupe County judge faces state inquiry over data center deal
The sheriff said he received information over the summer suggesting the judge violated state law in dealings with representatives of the project, reviewed it and sent it to the county attorney, who referred it to the Texas Rangers. Only the opening paragraphs were readable without a subscription. These are allegations and no finding has been reported; the San Marcos Daily Record reported on October 22, 2026 that DPS said the request was under review and that the judge said he could not comment because of pending litigation.
The Seguin GazetteRead
2026-09-22Abbott pauses TCEQ data center permitting in Texas
Reports a governor's letter to TCEQ halting permits sought by data centers until ERCOT completes an audit. Only the opening paragraphs were readable; whether the pause reached permit WQ0005514000 was not confirmed.
The Seguin GazetteRead
2026-09-03Water district seeks answers on Palomino Alpha data center
At the August 27 meeting the item was discussion-only and no vote could be taken. Directors said they lacked technical, financial, legal and environmental information; counsel said company representatives had asked not to be on the agenda. A statement from state Rep. Alan Schoolcraft urging delay or denial was read.
San Marcos Daily RecordRead
2026-08-04Texas ag commissioner says Gov. Abbott's data center crackdown 'doesn't put the brakes on anything'
Reports the lawsuit as still pending and a Crystal Clear vote on the water allocation as expected in August.
KSATRead
2026-07-28Guadalupe County sued over data center agreements; plaintiffs allege judge's conflict of interest
The plaintiffs seek to have the development and abatement agreements for both projects declared invalid. The developer's representative told the Crystal Clear board the company was "told there was available water" and wanted a yes or no. Opponents said records suggest the request could grow to 2.3 million gallons per day; that figure is theirs.
San Marcos Daily RecordRead
2026-07-24Public cries out against data center projects in Guadalupe County
Hundreds attended the July 23 Crystal Clear meeting at the Geronimo Community Center. Project representatives said the developer had completed every application step and wanted an answer. The board discussed the item briefly and did not act. Only the opening paragraphs were readable without a subscription; the rest is as reported by Community Impact and the district's minutes.
The Seguin GazetteRead
2026-07-24Guadalupe County sued over data center development agreements
Suit filed July 20, 2026 by the Data Center Action Coalition and residents, represented by a Save Our Springs Alliance attorney. Says Judge Kutscher recused himself from the December 17, 2024 abatement vote and the April 15, 2025 development agreement vote.
Community ImpactRead
2026-07-24Dog's Head Recap + Join Us for Data Center Action Week
Statement by the plaintiffs' counsel's organization: the suit asks the court to stop the county from using or enforcing the approvals. An advocacy source, not a news outlet.
Save Our Springs AllianceRead
2026-07-23Lawsuit filed against Guadalupe County
The petition alleges Open Meetings Act, conflict-of-interest and Tax Code violations; that the judge owns land in the project area under contract to the developer. The plaintiffs' attorney said records indicate the applicant was brought into an executive session in October 2024. The petition says the two projects cover more than 1,700 acres and about $150 million in county abatements. Judge Kutscher declined to comment because of the litigation.
Seguin Today (KWED)Read
2026-07-23Data centers draw backlash, lawsuit in Guadalupe County as residents raise transparency concerns
Neither Palomino Alpha nor CloudBurst replied to KSAT. The county attorney's office declined to comment on pending litigation.
KSATRead
2026-07-22Lawsuit Challenges Central Texas County's Tax Breaks for AI Data Centers
Subscription required; only the opening was readable.
Texas Lawyer (Law.com)Read
2026-07-21Group sues Guadalupe county, commissioners court over data centers
The suit names the county, the court, the county judge and each commissioner. A coalition spokesperson said the judge and his family own 186 acres being sold to Palomino Alpha. Only the opening paragraphs were readable without a subscription; these details are also reported by the San Marcos Daily Record of July 28, 2026.
The Seguin GazetteRead
2026-06-09Residents oppose data center water agreement at packed Crystal Clear meeting
Calls the project an 870-acre development. All but four speakers in about three hours of comment opposed the water sale. The company's representative said the project would put "a minimum of $400 million of property tax revenue" into the school system. Judge Kutscher spoke "as a landowner that has a piece of property in this transaction". The postponement passed unanimously.
San Marcos Daily RecordRead
2026-06-05Crystal Clear Utility board tables data center water request in Guadalupe County
The board heard public comment, held what the paper called a two-hour executive session and moved the item to a later agenda. Only the opening paragraphs were readable.
The Seguin GazetteRead
2026-06-04Hill Country residents push water utility to say no to data center
Describes a 940-acre site beside a substation on Texas 123. Says Palomino Alpha LLC was formed in 2024, is managed by Yarrington Land Holdings of Austin, and had not bought the land. The company's representative said the project would generate at least $4 million in school property tax and 100 to 200 jobs. The board president and general counsel said the utility cannot deny water over environmental concerns.
San Antonio Express-News (via Yahoo News)Read
2026-06-03"Do your homework," Crystal Clear board tables proposed data center water agreement
The board tabled the agreement after an executive session. Thomas Dubel, a consultant for Palomino Alpha, and Judge Kutscher spoke in favor.
CBS Austin (KEYE)Read
2026-02-27Officials amend changes for data center plans officially in the works in Guadalupe County
3-1 vote to expand and amend the zone. Commissioner Ott said the item let the developer expand "because you have bought more land" and that the added space was a buffer. Judge Kutscher said the property has been in his family since the 1930s.
Seguin Today (KWED)Read
2026-02-24Residents give Guadalupe County commissioners input on proposed data center deals
About a dozen people spoke against data centers at the February 24 court meeting. Only the opening paragraphs were readable.
The Seguin GazetteRead
2024-12-03County OKs reinvestment zone for development
Reports that Judge Kutscher abstained because he is part owner of the land: the owners of about 440 acres planned to sell to a developer, and he said he and his wife own about 10 of those acres. Only the opening paragraphs were readable without a subscription.
The Seguin GazetteRead

Timeline

  1. ERCOT. The October 2026 interconnection report still listed the five Alpha Power requests, with a screening study completed October 6, 2026 and no interconnection agreement. Source
  2. Crystal Clear Special Utility District. A district director told the San Marcos Daily Record the water agreement was paused at the company's request, the feasibility study had expired, and the matter seemed "dormant, or has gone away". Source
  3. Texas Department of Public Safety. The Seguin Gazette reported that allegations about the County Judge's dealings with the project had been referred to the Texas Rangers. DPS said the request was under review. Source
  4. Crystal Clear Special Utility District. Board discussed the agreement again. It was posted for discussion only, so no vote was taken; the San Marcos Daily Record reported that no company representative attended. Source
  5. ERCOT. The July 2026 interconnection report first listed five gas-fired "Alpha Power" generation requests by Palomino Alpha, LLC at the Zorn substation, 400.1 MW each. Source
  6. Crystal Clear Special Utility District. Board discussed the water agreement at the Geronimo Community Center; no action taken. Source
  7. State district court, Guadalupe County. The Data Center Action Coalition and three residents sued the county, the Commissioners Court and its members over the Palomino Alpha and CloudBurst approvals, alleging Open Meetings Act, Tax Code and conflict-of-interest violations. Cause No. 26-2397-CV-C, District Court of Guadalupe County. Source
  8. Crystal Clear Special Utility District. Board took up a water agreement for up to 500,000 gallons per day. A first motion to table failed 3-3; after an executive session the board tabled it. Source
  9. Texas Commission on Environmental Quality. Declared the application administratively complete and issued the notice of receipt; technical review began. Source
  10. Texas Commission on Environmental Quality. Received the application for wastewater discharge permit WQ0005514000 (500,000 gallons per day to a tributary of York Creek). Source
  11. Guadalupe County Commissioners Court. Public hearing, then three votes: expanded the zone to 942.29 acres, amended the abatement agreement (construction start moved to the end of 2027) and amended the development agreement (about 940 acres; on-site gas-fired generation allowed). Each passed 3-1, Germann against, Judge Kutscher abstaining. Source
  12. Guadalupe County Commissioners Court. After a closed session, set a February 24 public hearing on 'the designation or expansion of a Guadalupe County Reinvestment Zone' (4-0, Judge Kutscher abstaining); the notice posted the next day identified it as Palomino Alpha Reinvestment Zone #1. Source
  13. Guadalupe County. Posted the 30-day notice of an amended abatement agreement: 942.29-acre zone, multi-building data center campus, estimated cost $600,000,000+. Source
  14. Guadalupe County Commissioners Court. Approved a revised development agreement for about 365 acres, with the gas plant wording removed (3-0; Germann abstained; Judge Kutscher left the room). Source
  15. Guadalupe County Commissioners Court. Motion to approve a development agreement failed 2-2 (Engelke and Germann against; Judge Kutscher abstaining). The draft covered a data center and a combined cycle natural gas power plant. Source
  16. Guadalupe County Commissioners Court. After an executive session, approved a ten-year tax abatement agreement with Palomino Alpha, LLC: 90% for years 1-5, then 80%, 70%, 60%, 50% and 40% (4-0, Judge Kutscher abstaining). Source
  17. Guadalupe County Commissioners Court. Public hearing, then Order 20241203-8A designating Palomino Alpha Reinvestment Zone #1 on 438.2 acres (3-0; Engelke absent). The Seguin Gazette reported that Judge Kutscher abstained as a part owner of the land. Source
  18. Guadalupe County Commissioners Court. Resolution 11122024-7E adopted the county's guidelines and criteria for tax abatements (5-0).
  19. Texas Secretary of State. Palomino Alpha, LLC registered as a Texas limited liability company (Comptroller franchise tax record). Source