| 2026-11-02 | Generator Interconnection Status (GIS) Report, October 2026 Spreadsheet. Lists five requests by Palomino Alpha, LLC at the 345 kV Zorn substation: Alpha Power Phase 1 through Phase 5 (28INR0532, 29INR0363, 30INR0143, 31INR0025, 32INR0007), gas turbines of 400.1 MW each, projected to start operating at the end of 2028, 2029, 2030, 2031 and 2032. Phase 1 shows a full interconnection study requested 2026-07-01 and a screening study completed 2026-10-06; no interconnection agreement signed. These are power plants, not the data center's load. | ERCOT | Open |
| 2026-10-13 | Chapter 312 reinvestment zone registry (statewide data file) Record 000022863, reported by Guadalupe CAD: "Palomino Alpha Reinvestment Zone 1", active, 942 acres, effective 02/24/2026, expires 12/03/2029, submitted 10/13/2026. | Texas Comptroller | Open |
| 2026-08-03 | Generator Interconnection Status (GIS) Report, July 2026 The first monthly report to list the five Alpha Power requests. The February through June 2026 reports do not list them. | ERCOT | Open |
| 2026-07-20 | Original petition, Data Center Action Coalition and three residents v. Guadalupe County, the Commissioners Court and its members Cause No. 26-2397-CV-C. A file-stamped copy was read for this site's CloudBurst record; it is not linked because it contains the plaintiffs' home addresses. Filing reported by the Seguin Gazette, Seguin Today, Community Impact, KSAT and the San Marcos Record. | District Court of Guadalupe County | Not yet archived. Have it? |
| 2026-05-11 | Palomino Alpha Data Center Feasibility Study Not obtained. Cited as Exhibit D of the draft water agreement; the exhibit pages in the posted packets are blank. A district director said in October 2026 that the study had expired (San Marcos Record). | M&S Engineering for Crystal Clear Special Utility District | Not yet archived. Have it? |
| 2026-04-22 | Notice of Receipt of Application and Intent to Obtain Water Quality Permit, proposed permit WQ0005514000 Copy posted by Guadalupe County on April 28, 2026. Discharge route: an unnamed tributary, Soil Conservation Service Site 7 Reservoir, York Creek, then the Lower San Marcos River. The plant site is about 0.4 miles southwest of State Highway 123 and FM 1979. The application was declared administratively complete; the public comment deadline is set by a later notice. | Texas Commission on Environmental Quality | Open |
| 2026-03-16 | TPDES application WQ0005514000, administrative package (Palomino Alpha WWTP) 165 pages. New industrial wastewater permit for a 500,000 gallon-per-day activated sludge plant, prepared by Kimley-Horn. The application says 90% of the wastewater will come from cooling the data centers and 10% from offices, that cooling towers will discharge blowdown (number of towers "TBD"), and that the flow may contain reverse-osmosis reject. Customer number CN606482925, regulated entity RN112394127. Applicant contacts use Yarrington Land email addresses. Includes TCEQ's March 26, 2026 notice of deficiency and the applicant's response. | Texas Commission on Environmental Quality | Open |
| 2026-02-24 | Order expanding Palomino Alpha Reinvestment Zone #1 (title spelled "Palamino") Attachment A: 942.29 acres in 20 parcels with the owner of record for each, plus two right-of-way easements. Four of the parcels, 186.39 acres together, are listed under the County Judge's surname: two (10.10 acres) under the Judge and his spouse, and two (176.29 acres) under another owner. The order does not state the relationship; the Judge told the court on February 24, 2026 that his own and family property is in the project. The zone's expiration date stays five years from December 3, 2024. Recites newspaper notice in the Seguin Gazette of February 14-15, 2026. | Guadalupe County | Open |
| 2026-02-24 | First Amendment to the Tax Abatement Agreement between Guadalupe County and Palomino Alpha, LLC Moves the deadlines: construction to begin by December 31, 2027, first phase complete by December 31, 2029, all phases by December 31, 2034. Adds the zone expansion order as Exhibit D. Agenda copy, unsigned. | Guadalupe County | Open |
| 2026-02-24 | First Amendment to the Development Agreement with Palomino Alpha, LLC Changes the property from about 365 acres to about 940 acres and adds Section 3.08, giving the owner the right to build on-site power generation, including natural-gas-fired units, fuel lines, substations and battery storage. Agenda copy, unsigned. | Guadalupe County | Open |
| 2026-02-24 | Executed copies of the tax abatement agreement amendment and development agreement amendment Not obtained. The copies posted with the agenda are unsigned. | Guadalupe County | Not yet archived. Have it? |
| 2026-02-11 | Public Hearing Notice: designation or expansion of a Guadalupe County reinvestment zone Posted on the county's Public Notices page. Sets the February 24, 2026 hearing and lists the 20 appraisal district parcel IDs in the 942.29-acre zone: 64307, 64243, 140259, 149858, 139579, 166583, 64129, 64186, 64149, 64150, 64245, 199373, 64278, 186569, 64174, 64190, 64191, 64192, 64193 and 64144, plus a right-of-way easement. | Guadalupe County | Open |
| 2026-01-23 | Notice under Tax Code 312.207: tax abatement agreement with Palomino Alpha, LLC Names Palomino Alpha, LLC as property owner and applicant; Palomino Alpha Reinvestment Zone #1, 942.29 acres in Precinct 2; a multi-building data center campus; estimated cost of improvements $600,000,000+. | Guadalupe County | Open |
| 2025-04-15 | Palomino Alpha-Guadalupe County Development Agreement, updated April 10, 2025 The version approved April 15, 2025. About 365 acres on the west side of State Highway 123, outside any city limits or extraterritorial jurisdiction. The gas power plant wording is removed. Water from Crystal Clear SUD, on-site sewage facilities, electricity from LCRA (wholesale) and Guadalupe Valley Electric Cooperative (retail). The county agrees not to impose a moratorium on the property during the ten-year term. The signature block reads Palomino Alpha, LLC, by Yarrington Land Holdings, LLC, its managing member, by Matt Hainline, manager. Exhibit A lists nine parcel IDs. | Guadalupe County | Open |
| 2025-03-25 | Palomino Alpha Development Agreement, draft presented March 25, 2025 The version that failed 2-2. It defines the project as an industrial data center, combined cycle natural gas power plant and related improvements on about 365 acres. | Guadalupe County | Open |
| 2024-12-17 | Tax Abatement Agreement between Guadalupe County and Palomino Alpha, LLC The original agreement is attached as Exhibit One to the February 2026 amendment packet (scanned; this link is that packet). Terms: a multi-building data center campus with a minimum 200 MW capacity; minimum new investment of $400,000,000 and at least $125,000,000 per phase; at least 50 jobs; construction to begin by December 31, 2026; ten years of abatement per building at 90% for years 1-5, then 80%, 70%, 60%, 50% and 40%; lateral road tax not abated. Signed for Palomino Alpha, LLC by Matt Hainline as manager. | Guadalupe County | Open |
| 2024-12-03 | Order No. 20241203-8A designating Palomino Alpha Reinvestment Zone #1 (title spelled "Palamino") Scanned order with Attachment A: 438.2 acres in 11 appraisal district parcels plus two right-of-way easements, Charles Henderson Survey, Abstract 147. Five-year designation, renewable. Recites newspaper notice in the Seguin Gazette of November 23-24, 2024. | Guadalupe County | Open |
| 2024-11-12 | Resolution No. 11122024-7E: Guidelines and Criteria for Tax Abatements in Reinvestment Zones, with application form and compliance report The county's abatement policy, adopted 5-0 three weeks before the Palomino Alpha zone was designated. The zone order and the abatement agreement both cite it. Agenda attachment; the link redirects to the county's Granicus file server. | Guadalupe County | Open |
| Abatement Notices page Lists the Palomino Alpha notice dated 01/23/2026. | Guadalupe County | Open |
| Memorandum of Development Agreement, recorded copy Not obtained. The development agreement (Section 9.04) says a memorandum will be recorded in the county real property records. The agreement also says it takes effect only after the owner closes on the land and a deed is recorded. | Guadalupe County Clerk | Not yet archived. Have it? |
| Commissioners Court meeting archive (agendas, minutes, video) Every agenda and set of minutes from August 2024 through the December 1, 2026 agenda was downloaded and searched for Palomino, data center, reinvestment zone and abatement. Palomino Alpha items appear only at the meetings listed here. No item renewing the abatement guidelines appears on the November 3, November 17 or December 1, 2026 agendas. | Guadalupe County (Granicus) | Open |
| Pending TPDES applications list Checked 2026-11-27: lists Palomino Alpha, LLC, Palomino Alpha WWTP, WQ0005514000, Guadalupe County, dated 4/22/2026, with only the administrative package posted. No technical package or draft permit is posted. | Texas Commission on Environmental Quality | Open |
| Central Registry: regulated entity RN112394127, Palomino Alpha WWTP Not retrievable by automated request; open it in a browser. EPA's ECHO database lists two NPDES IDs for the Palomino Alpha WWTP, TX0149039 and TX0149110; the pending application carries TX0149110. | Texas Commission on Environmental Quality | Open |
| Commissioners' Integrated Database file for WQ0005514000 (comments, hearing requests, status) Not obtained: the database refused automated requests. The notice says public comments and hearing requests are filed there under the permit number. No Notice of Application and Preliminary Decision, public meeting notice or hearing request was found by other means. | Texas Commission on Environmental Quality | Not yet archived. Have it? |
| Large-load interconnection request for the data center Not found. ERCOT does not publish large-load requests by project, and no LCRA or co-op board item naming the project was located. | ERCOT / LCRA Transmission Services / Guadalupe Valley Electric Cooperative | Not yet archived. Have it? |
| Chapter 312 abatement agreement registry (statewide data file) Checked 2026-11-27: no Palomino Alpha agreement among the 102 Guadalupe County rows. | Texas Comptroller | Open |
| Data center registry Checked 2026-11-27: no Palomino Alpha or Yarrington entry. | Texas Comptroller | Open |
| Franchise tax account status: Palomino Alpha, LLC Texas LLC, Secretary of State file number 0805687103, registered 08/28/2024, active. Mailing address 3801 N Capital of Texas Hwy, Austin. No officers listed. | Texas Comptroller | Open |
| Franchise tax account status: Yarrington Land Holdings LLC Texas LLC, Secretary of State file number 0803573695, registered 03/13/2020, active, same Austin street address. Lists Matthew Hainline as manager and director. | Texas Comptroller | Open |
| PUC dockets Not searched: the PUC Interchange search needs a control number, and none naming the project was found. | Public Utility Commission of Texas | Not yet archived. Have it? |
| Yarrington: Palomino Alpha (tracker listing) Third-party tracker with no sources cited. Lists 870 acres, a 2029 planned year and the status "In Doubt". Not used for any fact in this record. | Baxtel | Open |
| Palomino Alpha Data Center (tracker listing) Third-party tracker. Lists 360 MW and 365 acres and dates a 2-2 development agreement vote to March 25, 2026. The county minutes show the 2-2 vote was on March 25, 2025 and that no Palomino Alpha item was on the court's March 2026 agendas. | Central Texas Data Center Tracker | Open |